CASIA OpenIR  > 09年以前成果
Timed event graph-based cyclic reconfigurable flow shop modelling and optimization
Ren, S. C.; Xu, D.; Wang, F.; Tan, M.
Source PublicationINTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
2007
Volume45Issue:1Pages:143-156
SubtypeArticle
AbstractThe manufacturing process of a part involves sequential steps and each step could be viewed as the part being manufactured by a process module with some specific function. The module must be placed on a machine and connected to the machine via standard interfaces. The machine considered here is a carrier or general platform that can hold one or several different modules simultaneously. Based on the idea that modules are independent of machines and different combinations of modules and machines result in different configurations, the cyclic reconfigurable flow shop is proposed for the new manufacturing paradigm - Reconfigurable Manufacturing System (RMS). The cyclic reconfigurable flow shop can be modelled as a timed event graph. Different cases of cyclic reconfigurable flow shops are discussed and the optimal configuration can be obtained by solving the corresponding mixed-integer program derived from the timed event graph model.
KeywordReconfigurable Manufacturing System Configuration Module Flow Shop Timed Event Graph Modelling
WOS HeadingsScience & Technology ; Technology
WOS KeywordANALYTICAL HIERARCHICAL PROCESS ; MANUFACTURING SYSTEMS RMSS ; MODULAR LOGIC CONTROLLERS ; PERFORMANCE EVALUATION ; PETRI NETS ; STOCHASTIC-MODEL ; MACHINING SYSTEMS ; OPTIMAL SELECTION ; MARKED GRAPHS ; DESIGN
Indexed BySCI
Language英语
WOS Research AreaEngineering ; Operations Research & Management Science
WOS SubjectEngineering, Industrial ; Engineering, Manufacturing ; Operations Research & Management Science
WOS IDWOS:000242019100007
Citation statistics
Document Type期刊论文
Identifierhttp://ir.ia.ac.cn/handle/173211/9430
Collection09年以前成果
Affiliation1.Chinese Acad Sci, Inst Automat, Beijing 100080, Peoples R China
2.Tsinghua Univ, Dept Automat, Beijing 100084, Peoples R China
Recommended Citation
GB/T 7714
Ren, S. C.,Xu, D.,Wang, F.,et al. Timed event graph-based cyclic reconfigurable flow shop modelling and optimization[J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2007,45(1):143-156.
APA Ren, S. C.,Xu, D.,Wang, F.,&Tan, M..(2007).Timed event graph-based cyclic reconfigurable flow shop modelling and optimization.INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,45(1),143-156.
MLA Ren, S. C.,et al."Timed event graph-based cyclic reconfigurable flow shop modelling and optimization".INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 45.1(2007):143-156.
Files in This Item: Download All
File Name/Size DocType Version Access License
Timed event graph-ba(203KB)期刊论文作者接受稿开放获取CC BY-NC-SAView Download
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[Ren, S. C.]'s Articles
[Xu, D.]'s Articles
[Wang, F.]'s Articles
Baidu academic
Similar articles in Baidu academic
[Ren, S. C.]'s Articles
[Xu, D.]'s Articles
[Wang, F.]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Ren, S. C.]'s Articles
[Xu, D.]'s Articles
[Wang, F.]'s Articles
Terms of Use
No data!
Social Bookmark/Share
File name: Timed event graph-based cyclic reconfigurable flow shop modeling and optimization.pdf
Format: Adobe PDF
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.