CASIA OpenIR

浏览/检索结果: 共1条,第1-1条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
A Hybrid MIP & x2013;CP Approach to Multistage Scheduling Problem in Continuous Casting and Hot-Rolling Processes 期刊论文
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 卷号: 16, 期号: 4, 页码: 1860-1869
作者:  Tan, Yuanyuan;  Zhou, MengChu;  Wang, Yingying;  Guo, Xiwang;  Qi, Liang
收藏  |  浏览/下载:169/0  |  提交时间:2020/03/30
Slabs  Job shop scheduling  Furnaces  Steel  Heating systems  Continuous casting (CC)  hot rolling (HR)  hybrid algorithm  hybrid system  reheating furnace  scheduling