Knowledge Commons of Institute of Automation,CAS
Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints | |
Jipeng Wang; Hesuan Hu; Chunrong Pan; Yuan Zhou; Liang Li | |
发表期刊 | IEEE/CAA Journal of Automatica Sinica |
ISSN | 2329-9266 |
2020 | |
卷号 | 7期号:3页码:776-789 |
摘要 | Accompanying the unceasing progress of integrated circuit manufacturing technology, the mainstream production mode of current semiconductor wafer fabrication is featured with multi-variety, small batch, and individual customization, which poses a huge challenge to the scheduling of cluster tools with single-wafer-type fabrication. Concurrent processing multiple wafer types in cluster tools, as a novel production pattern, has drawn increasing attention from industry to academia, whereas the corresponding research remains insufficient. This paper investigates the scheduling problems of dual-arm cluster tools with multiple wafer types and residency time constraints. To pursue an easy-to-implement cyclic operation under diverse flow patterns, we develop a novel robot activity strategy called multiplex swap sequence. In the light of the virtual module technology, the workloads that stem from bottleneck process steps and asymmetrical process configuration are balanced satisfactorily. Moreover, several sufficient and necessary conditions with closed-form expressions are obtained for checking the system’s schedulability. Finally, efficient algorithms with polynomial complexity are developed to find the periodic scheduling, and its practicability and availability are demonstrated by the offered illustrative examples. |
关键词 | Cluster tools multiple wafer types scheduling semiconductor manufacturing wafer fabrication |
DOI | 10.1109/JAS.2020.1003150 |
引用统计 | |
文献类型 | 期刊论文 |
条目标识符 | http://ir.ia.ac.cn/handle/173211/42988 |
专题 | 学术期刊_IEEE/CAA Journal of Automatica Sinica |
推荐引用方式 GB/T 7714 | Jipeng Wang,Hesuan Hu,Chunrong Pan,et al. Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints[J]. IEEE/CAA Journal of Automatica Sinica,2020,7(3):776-789. |
APA | Jipeng Wang,Hesuan Hu,Chunrong Pan,Yuan Zhou,&Liang Li.(2020).Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints.IEEE/CAA Journal of Automatica Sinica,7(3),776-789. |
MLA | Jipeng Wang,et al."Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints".IEEE/CAA Journal of Automatica Sinica 7.3(2020):776-789. |
条目包含的文件 | 下载所有文件 | |||||
文件名称/大小 | 文献类型 | 版本类型 | 开放类型 | 使用许可 | ||
JAS-2020-0118.pdf(2685KB) | 期刊论文 | 出版稿 | 开放获取 | CC BY-NC-SA | 浏览 下载 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论