CASIA OpenIR

浏览/检索结果: 共4条,第1-4条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Group Multi-Role Assignment With Conflicting Roles and Agents 期刊论文
IEEE/CAA Journal of Automatica Sinica, 2020, 卷号: 7, 期号: 6, 页码: 1498-1510
作者:  Haibin Zhu
Adobe PDF(984Kb)  |  收藏  |  浏览/下载:133/45  |  提交时间:2021/03/11
Agents  environments-classes, agents, roles, groups, and objects (E-CARGO) model  group multi-role assignment (GMRA)  group role assignment with constraints (GRA+)  roles  role-based collaboration (RBC)  
Robust Deadlock Avoidance Policy for Automated Manufacturing System With Multiple Unreliable Resources 期刊论文
IEEE/CAA Journal of Automatica Sinica, 2020, 卷号: 7, 期号: 3, 页码: 812-821
作者:  Jianchao Luo;  Zhiqiang Liu;  Shuogang Wang;  Keyi Xing
Adobe PDF(1251Kb)  |  收藏  |  浏览/下载:124/41  |  提交时间:2021/03/11
Automated manufacturing system (AMS)  deadlock avoidamce policy (DAP)  modified Banker’s algorithm (MBA)  Petri net  
Scheduling Dual-Arm Cluster Tools With Multiple Wafer Types and Residency Time Constraints 期刊论文
IEEE/CAA Journal of Automatica Sinica, 2020, 卷号: 7, 期号: 3, 页码: 776-789
作者:  Jipeng Wang;  Hesuan Hu;  Chunrong Pan;  Yuan Zhou;  Liang Li
Adobe PDF(2685Kb)  |  收藏  |  浏览/下载:180/44  |  提交时间:2021/03/11
Cluster tools  multiple wafer types  scheduling  semiconductor manufacturing  wafer fabrication  
Post-Processing Time-Aware Optimal Scheduling of Single Robotic Cluster Tools 期刊论文
IEEE/CAA Journal of Automatica Sinica, 2020, 卷号: 7, 期号: 2, 页码: 597-605
作者:  QingHua Zhu;  Yan Qiao;  NaiQi Wu;  Yan Hou
Adobe PDF(3300Kb)  |  收藏  |  浏览/下载:156/56  |  提交时间:2021/03/11
Cluster tool  discrete event systems  optimization  robotic systems  scheduling